Modernisation and Enlargement of the Drinking Water Plant Irsch-Treves

4,90 €
Auf Lager
Artikelnummer
05399_2011_SP1_03
The second largest ultra filtration plant in Germany under construction
PDF Download
The modernisation and enlargement of the second largest drinking water treatment plant (WTP) in Germany with the integration of an ultra-filtration stage began in February 2011, after more than a year of pilot tests. Following the current timetable the WTP in Irsch-Trier will be fully operational in summer 2013. The plant has a maximum capacity of 1600 m³/h and purifies about 6 million m³ of drinking water per annum for the city of Treves and some surrounding communities. This paper gives a short description of the Riveris reservoir, the raw water and the existing WTP in Irsch-Treves. Furthermore, the reasons for upgrading the WTP, the targets for the new plant and the results of the pilot project are outlined. The bulk of the paper will however, be dedicated to the operational, design and constructional details of the new plant.
Mehr Informationen
Autoren Akongha N. Lambert/Michael Kollete, Helfried Welsch, Christian Girndt, Andreas Holy, Sven Schroll and Thomas Winter
Erscheinungsdatum 30.06.2011
Format PDF
Zeitschrift gwf - Wasser|Abwasser - Special 1 2011
Verlag DIV Deutscher Industrieverlag GmbH
Sprache English
Seitenzahl 8
Titel Modernisation and Enlargement of the Drinking Water Plant Irsch-Treves
Untertitel The second largest ultra filtration plant in Germany under construction
Beschreibung The modernisation and enlargement of the second largest drinking water treatment plant (WTP) in Germany with the integration of an ultra-filtration stage began in February 2011, after more than a year of pilot tests. Following the current timetable the WTP in Irsch-Trier will be fully operational in summer 2013. The plant has a maximum capacity of 1600 m³/h and purifies about 6 million m³ of drinking water per annum for the city of Treves and some surrounding communities. This paper gives a short description of the Riveris reservoir, the raw water and the existing WTP in Irsch-Treves. Furthermore, the reasons for upgrading the WTP, the targets for the new plant and the results of the pilot project are outlined. The bulk of the paper will however, be dedicated to the operational, design and constructional details of the new plant.
Eigene Bewertung schreiben
Sie bewerten:Modernisation and Enlargement of the Drinking Water Plant Irsch-Treves
© 2017 Vulkan-Verlag GmbH